Foxtrot Road Stormwater Pipe

Stormwater

Foxtrot Road Drainage Improvements

Drainage Assistance Program

Several sinkholes were seen along the storm drain between 2401 and 2405 Foxtrot Road resulting from failing stormwater infrastructure. The plan is to repair the sinkholes and reconstruct the outfall which may include installation of a larger stormwater pipe.

Project Details

 
Type:
Stormwater
Budget:
$71,000 (Design)
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Matthew Lassiter
Senior Engineer
matthew.lassiter@raleighnc.gov
919-996-3477

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

Raleigh Stormwater is in the beginning stages of the project. More information will become available throughout the year.

Lead Department:
Engineering Services

Schedule

Date
Activity
Summer 2024
Project Design begins
Winter 2024
Project Design complete
Spring 2025
Permitting/Easement acquisition
Fall 2025
Construction begins
Winter 2025
Construction Completed

Stormwater Infrastructure

Select the images to see the current conditions of the stormwater pipe.