Frank Street Pipe and Fence

Stormwater

Frank Street Neighborhood Improvements

Stormwater Drainage System Improvements

Raleigh Stormwater is analyzing and designing proposed stormwater improvements affecting several residences near the Frank Street corridor.

Project Details

 
Type:
Stormwater
Budget:
TBD
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Erik Mayr, PE
Project Manager
erik.mayr@raleighnc.gov
919-996-4077

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

We are planning surveys and developing design options to improve the stormwater pipes affecting several residences near the Frank Street corridor. More information will be provided as the project continues.

Project Goals

  • Reduce flooding on residential properties
  • Update and improve existing stormwater pipes and infrastructure
Lead Department:
Engineering Services

Schedule

DateActivity
Winter/Spring 2024Project Planning begins
Summer 2024Project Design begins
Fall 2025Project Design complete
Winter/Spring 2026Construction begins