This project will use innovative rehabilitation methods to repair pipes that minimizes surface disturbance. The City of Raleigh has identified 13 sites where stormwater pipes have been determined to be in poor condition. The project will use internal repair techniques without the need to dig and replace.
Project Details
- Type:
-
Stormwater
- Budget:
-
$1,200,000
- Project Lead:
-
Stormwater Management
- Contractors:
-
CDM Smith (Design)