Saratoga Drive Stormwater Construction

Stormwater

Saratoga Headwall Replacement Project

Stormwater System Upgrade

We are replacing the wall at the end of the concrete pipe culvert on Saratoga Drive between Greywood Drive and Old Creek Court. The culvert on Saratoga Drive carries water from Beaman Lake into a unnamed tributary to Marsh Creek.

Project Details

 
Type:
Stormwater
Project Lead:
Stormwater Management
Contractors:
WSP USA Inc.

Contact

 

Jordan Pack
Engineer
jordan.pack@raleighnc.gov
919-996-4080

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

The team is working on a solution to repair or replace the downstream endwall on the culvert that runs under Saratoga Drive between Greywood Drive and Old Creek Court. 

The planning for this project includes:

  • Survey work;
  • Utility coordination; and,
  • Structural assessments. 

The project team is considering wingwalls and protection measures to help reduce downstream channel erosion. 

Lead Department:
Engineering Services

Design

We completed the design phase and advertised the project for construction bids.

Lead Department:
Engineering Services

Construction

Construction Details

Construction will begin September 16 and is anticipated to be completed December 2024. Work includes replacing the existing headwall and implementing outlet improvements between 3645 Greywood Dr. and 3912 Old Creek Ct. Work hours will be Monday - Friday from 7:30 a.m. to 5:30 p.m. with no work scheduled on the weekend except in an emergency or with prior approval from the City.

Saratoga Drive Stormwater Construction
Lead Department:
Engineering Services

Schedule

DateProject Stage
Fall 2022Planning Phase Completed
Winter 2022Design and permit process started
Winter 2023Plan review phase started
Early 2024Bidding process started
Fall 2024Construction phase started