Northbrook Construction Complete

Stormwater

Northbrook Drive Streambank Stabilization

Drainage Assistance Program

We repaired the eroded stream that flows alongside a property on Northbrook Drive. The project was bundled with the Hunting Ridge Road Streambank Stabilization project.

Project Details

 
Type:
Stormwater
Budget:
$95,000
Project Lead:
Stormwater Management
Contractors:
McAdams (Design)

Contact

 

Raleigh Stormwater
raleighstormwater@raleighnc.gov
919-996-3940

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Pre-Approval

This phase is complete. 

Lead Department:
Engineering Services

Planning

This phase is complete. 

Lead Department:
Engineering Services

Design

The consultant has completed the design for this project. The unnamed stream to Mine Creek is eroding in the front and side yard of a property on Northbrook Drive. The erosion is within five feet of the foundation of the home, which causes safety concerns.

Project Goals

  • Use boulders to stabilize 80 feet of the streambank; 
  • Fix the slope of the streambank; and, 
  • Plant on the streambank. 
Lead Department:
Engineering Services

Construction

The contract was selected early 2024 and construction will begin Spring 2024.

Lead Department:
Engineering Services

Complete

We completed construction of the project and will do live plantings in Fall 2024.

Northbrook Construction Complete

Northbrook Construction Complete

Northbrook Pre-Construction

Northbrook Pre-Construction

Lead Department:
Engineering Services

Schedule

DateActivity
Spring 2021Project planning
Fall 2022Project design complete
Early 2024Project bidding completed
Spring 2024Project construction begins
Late Summer 2024Project construction complete