Midlands Townhomes Erosion

Stormwater

Midlands Townhomes Streambank Stabilization

Drainage Assistance Program

There is 150 linear feet of streambank erosion between private residential structures on Bernadette Lane and Kelley Court. The streambank erosion is approaching toward the residential structures at 7725-7735 Kelley Court.

Project Details

 
Type:
Stormwater
Budget:
$100,335
Project Lead:
Stormwater Management
Contractors:
WSP USA Inc.

Contact

 

Kyle Bucher
Senior Engineer
kyle.bucher@raleighnc.gov
919-996-4068

Lead Department:
Engineering Services
Service Unit:
Stormwater

Subscribe

 

Planning

All planning tasks were completed in April 2024.

Lead Department:
Engineering Services

Design

The consultant has finished collecting all survey and field data and is preparing preliminary hydrologic and hydraulic analysis currently. Initial design plans to be submitted in Spring 2024.

Project Upgrades

  • Stable streambanks utilizing bank armoring (where necessary) and natural channel design principles;
  • Protection of underground utility assets in the area
Lead Department:
Engineering Services

Schedule

DateActivity
Winter 2023Project Planning complete
Winter 2024Project Design begins, Survey and Field Data Collection complete
Summer/Fall 2024Permitting and Easement Acquisition
Winter 2024Design Phase complete
Winter 2025Anticipated Construction Start

Project Map

Background

This project was approved by the Stormwater Management Advisory Commission (SMAC) in May 2023 as part of the Drainage Assistance Program.