We will repair the eroded streambanks downstream of the Lower Longview Dam. There are two locations of streambank erosion to be fixed:
- The stream channel immediately downstream of the dam outlet structure.
- The stream channel immediately downstream of the culvert under Milburnie Road.
The project will include boulder wall structures at both project locations to address the existing erosion.
Project Details
- Type:
-
Stormwater
- Budget:
-
$97,939 (Design)
- Project Lead:
-
Stormwater Management
- Contractors:
-
Ecosystem Planning and Restoration, PLLC (EPR) (Design)