The completed Lake Johnson Loop Trail Project re-opened to the public on April 16, 2021, included repaving and improving drainage conditions along a one-mile section of the existing paved section of the Walnut Creek Trail that runs between the Lake Johnson Waterfront Center, on the north side of Lake Johnson, and the dam located adjacent to Lake Dam Road. This segment is located on what’s commonly referred to as Lake Johnson’s East Loop Trail.
Project Details
- Type:
-
Greenways and Trails
- Budget:
-
$684,565,31
- Contractors:
-
Dewberry Engineers, Inc (Design, Bidding Assistance and Construction Administration); State Contracting, Inc. (Contractor)