Brookhaven Dive without sidewalk

Transportation

Brookhaven Drive Sidewalk Project

We are installing a new sidewalk!

The Brookhaven Drive sidewalk project is the result of a successful petition to the city's Sidewalk Petition Program, received in the fall of 2019.

The new sidewalk is proposed to run along the south side of Brookhaven Drive from Rembert Drive northward towards Wildwood Street, with the existing sidewalk being replaced from York Elementary School.

Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering staff.

Project Details

 
Type:
Sidewalks
Project Lead:
Engineering Services

Contact

 

Project Manager
Lichuan Wang, PE
lichuan.wang@raleighnc.gov 


Comment Form

Lead Department:
Transportation
Participating Department:
Engineering Services
Service Unit:
Mobility Strategy and Infrastructure

Subscribe

 

Planning

City Council has authorized staff to design and construct the sidewalk improvements as funding and staff resources become available.

Lead Department:
Transportation

Design

Design Update, Apr. 3, 2025

The City has hired a design firm to advance this project along with other petitioned street and sidewalk projects. The design team is currently developing a new schedule for design and construction milestones. The design phase is expected to be completed by the end of this year.

The following projects are included in this group:

Lead Department:
Engineering Services