The Lake Boone Trail Extension street and sidewalk improvement project is the result of a successful petition for street and sidewalk improvements received by the City in the fall of 2019 and authorized by City Council to proceed with design and construction on December 3, 2019.
This project is being combined with Stormwater's Cambridge Woods Way Drainage Improvements project, to help address flooding concerns in the area.
Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering staff.
Project Details
- Type:
-
Sidewalks
- Contractors:
-
McAdams - Design Consultant