Looking down Lake Boone Trail towards Glenwood Avenue. Shows a dead end sidewalk and the need of a sidewalk

Transportation

Lake Boone Trail Street & Sidewalk Project

We are making Street and Sidewalk Improvements!

The Lake Boone Trail Extension street and sidewalk improvement project is the result of a successful petition for street and sidewalk improvements received by the City in the fall of 2019 and authorized by City Council to proceed with design and construction on December 3, 2019.

This project is being combined with Stormwater's  Cambridge Woods Way Drainage Improvements project, to help address flooding concerns in the area.   

Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering staff.

Project Details

 
Type:
Sidewalks
Contractors:
McAdams - Design Consultant

Contact

 

Design Project Manager
Erik Mayr, PE
erik.mayr@raleighnc.gov

Construction Project Manager
Keith Tew
keith.tew@raleighnc.gov

Comment Form

Lead Department:
TransportationEngineering Services
Service Unit:
Roadway Design and ConstructionStormwaterMobility Strategy and Infrastructure

Subscribe

 

Planning

We plan to pave install curb and gutter, add drainage improvements and construct a five-foot-wide sidewalk on a three-and-a-half-foot typical setback from the new curb along both sides of the street completing missing gaps from Edenburgh Road to the Glenwood Avenue Service Road. Adjustments to the sidewalk width and setback may be included in the final design to avoid significant impacts in certain areas as needed and determined by our Engineering Staff. This project is currently awaiting funding allocation for the official design and construction. Although some preliminary design work and surveys may have been completed the project timeline scheduling has not been determined.

If you have any questions or comments pertaining to this street and sidewalk improvement project please feel free to contact us via e-mail at Petition.Specialist@raleighnc.gov or by calling (919) 996-4054.

Lead Department:
Transportation

Design

We are in the early design phase of the project. This project is being combined with Raleigh Stormwater's Cambridge Woods Way Drainage Improvements project.

Lead Department:
Engineering Services

Project Schedule

DateActivity
August 2020Planning Phase begins
Spring 2025Design Phase started
2026Design Phase complete
2027Construction Phase begins
TBDConstruction Phase complete