During Hurricane Matthew and subsequent high-water events, the Crabtree Creek Trail sustained damage due to flooding and erosion. This damage caused erosion to stream banks and scoured under existing trail pavement. Due to the hazardous condition of the paved trail this section of the Crabtree Creek Trail was closed to the public.
This improvement project is located on the Crabtree Creek Trail at Mile Marker 11 1/4, (detour is available during construction along Alleghany Drive). The trail will be closed during construction.
Project Details
- Type:
-
Greenways and Trails
- Contractors:
-
Stantec Consulting Services (Design) Kiewit Infrastructure South Company (Construction)