Jump To:
Raleigh Water may determine during the rezoning, development plan, or building permit review process that the increase in sewer discharge associated with a project will exceed the available capacity of downstream sewer mains and that replacement of the existing downstream sewer mains may be required. Where adequate sewer capacity is a concern, a sewer study will be necessary.
With projects that anticipate an increase in sewer discharge capacity, Raleigh Water may require a sewer main replacement be made. During the rezoning, development plan, or building permit review process, where adequate sewer capacity is a concern, Raleigh Water will require a sewer capacity study to make the replacement determination.