The project will rehabilitate twin 72-inch *interceptors which are critical components of the City of Raleigh's sewer collection system. These interceptors deliver wastewater flows from the Walnut Creek Lift Station to the Neuse River Resource Recovery Facility.
Phase one services included a conditional assessment plan, interior pipe assessment specifications, and preparation of a condition assessment report with recommended rehabilitation and/or replacement methods for the twin interceptors. Phase two will be the final design and construction administration services.
* An interceptor is part of the wastewater system that helps to control wastewater flow.
Project Details
- Type:
-
Water and Sewer
- Budget:
-
$39,016,105
- Project Lead:
-
Edward Stempien, PE
- Contractors:
-
Raleigh Water/ CDM Smith