Approximately 15,900 linear feet of gravity sewer will be replaced with a larger diameter pipe and or an upgraded liner pipe. This replacement will prepare the sewer system for wet weather events that produce a higher amount of storm water. Once completed, the project will protect the sewer system against damage that might occur due to this higher yield.
The work will start at the connection to the Crabtree Creek adjacent to I-440 and extend along the east and west side of Shelly Lake to North Hills Drive. The project will require road crossings at West Millbrook Road and Shelley Road.
Project Details
- Type:
-
Water and Sewer
- Budget:
-
$30,000,000
- Project Lead:
-
Raleigh Water
- Contractors:
-
Brown and Caldwell