Durant Road 36-inch Transmission Main

Existing infrastructure found in this area is undersized and will be replaced and upgraded.

A new 36-inch water transmission main was recommended in the 2016 Water System Master Plan, to provide redundancy and additional capacity to the areas east of Capital Blvd. The new main will extend from the EM Johnson Water Treatment Plant to Capital Blvd.

Following easement acquisition and consultant selection, design should take 18 months. Construction should take 12 months.

Project Details

 
Type:
Water and Sewer
Budget:
$21,000,000

Contact

 

Matthew Cotton, PE
Senior Project Administrator
Phone: 919-996-3528 
Office Location: 1 Exchange Plaza Suite 620
Raleigh, NC 27601

Lead Department:
Water

Subscribe

 

Planning

Phase is complete.

Lead Department:
Water

Design

HDR was selected as the design consultant. That project is at 60% design and is in the easement acquisition phase. Design scheduled to be completed by end of 2024 with construction starting in early 2025.
 

Lead Department:
Water

Right of Way Acquisition

Check back for phase details. 

Lead Department:
Water

Construction

Check back for phase details. 

Lead Department:
Water

Complete

Check back for phase details. 

Lead Department:
Water

History

This is an expansion project to the current system deemed necessary through the 2016 Water System Master Plan.

Date Activity
Fall 2024 Project Design Complete
Spring 2024 Permitting Complete
winter 2025 Easement Acquisition Complete
Summer 2025 Project Bid Complete
Winter 2025 Project Construction Begins
Summer 2026 Project Construction Complete