Jump To:
Key Steps in the Process
To permit a special care facility in a residential district, the Board of Adjustment must conduct a hearing and find evidence establishing that:
- The special care facility may not be located within 1,200 feet of another special care facility (determined by a straight line from property line to property line).
- These minimum lot areas per enrollee apply:
a. Residential, Residential-2 and Residential-4 Districts - 1,040 square feet
b. Residential-6 - 640 square feet
c. Residential-10 - 240 square feet - In a residential district , one unlit announcement sign not to exceed two (2) square feet in area and 3 1/2 feet in height is permitted.
- Only one vehicle used by the facility will be parked or stored on the premises or residential street.
Additional development standards such as parking, landscaping and lighting may be required.
Monitor Your Project
Visit the Permit and Development Portal to view your project activity online. Once you have registered an account, you are able to view your project status, pay fees, and schedule inspections.
For a list of frequently asked questions, visit the Permit Portal Help Center.
Paying Fees
- Permit fee is due when application is accepted for processing. See Development Fee Schedule for current permit fee.
- Payment types include cash, MasterCard, Visa or check made payable to the City of Raleigh.